Shandong XXX Environmental Protection Technology Co., Ltd
Project content: a pyrolysis desorption resource disposal station project of oily sludge and oil-based drilling cuttings
Project location: Dongying City, Shandong Province
Treatment objects: floor sludge, tank cleaning sludge, tank bottom sludge and oil-based rock cuttings
Processing capacity: 80000 T / A
Scope of work: technology development, system design, equipment manufacturing, installation and commissioning, and technical services
Core device: spiral indirect pyrolysis desorption system equipment
Implementation time: February 2021